YKA
- To city center
- Kamloops · ~8.8 km
- Time to city
- Rental car (Budget / Enterprise / National class) · ~10–15 min to centre; longer to Sun Peaks
YKA
YLW

One map, pinned from each airport’s published coordinates.
Overall is the published weighted sum. A highlighted score is ahead; a tie stays plain.
25% · Wayfinding, security wait, and layout.
20% · Seating, Wi-Fi, cleanliness, and quiet.
15% · Food and retail quality and variety.
15% · Transit, taxi, and parking to the city.
15% · Delays, cancellations, and weather resilience.
10% · Worth-it density and access quality.
YKA
YLW
YKA
YLW
YKA
AC YVR + WJ YYC core
Air Canada Express Vancouver and WestJet Encore Calgary are the clear year-round-style pins; Edmonton seasonal; Pacific Coastal Victoria.
Single regional terminal
Compact Thompson plant with cafe / services framing.
Cafe-scale F&B
Bread Garden / snack framing historically — not YVR density.
YLW
Arrive 2 hours — CATSA opens 3:15 a.m.
Official FAQ and travel-tips cards: be at the terminal at least two hours before departure, domestic or international. Screening is printed 3:15 a.m. until the last departure.
One terminal — new west departures, not a second airport
One civil building. The January 2026 expansion added the west departures lounge and CATSA CT checkpoint; Phase 1 remaining work runs through late 2026.
Eat after CATSA unless you want Ellison or landside Tims
Live official shops page: airside White Spot 4:00 a.m.–11:00 p.m. (limited menu after 7:30 p.m.), Vintners Exchange first-to-last flight, Subway 5:30 a.m.–10:00 p.m., Tim Hortons 4:00 a.m.–8:00 p.m.
YKA · Thompson–Okanagan gateway with **Air Canada Express** Vancouver, **WestJet Encore** Calgary (seasonal Edmonton), and **Pacific Coastal** Victoria — **no Priority Pass lounge** verified on research day; rentals/taxis and paid parking cover ground including Sun Peaks access.
YLW · Canada’s ninth-busiest airport in a single civil hall — CATSA Plus, a real Okanagan food bench, and $17.50 long-term parking, traded against no lounge, no rail, and Phase 1 construction through late 2026.